A/V Solutions for Pinewood Studios
APAV has a leading commercial installation solutions provider in the areas of cinema and theater. Although we had worked with many theaters previously, it was a distinct honor to have been selected by Pinewood Studios to design and install sound and projection for their screening room and the Hanna Brothers Studio Café. The café doubles as a special events venue. Only the best equipment from the world’s top manufacturers was used.
Equipment Highlights of Theater:
- Christie Digital Sound
- Christie Digital Cinema Projectors
- Custom Fabrication and Acoustical Treatment
Equipment highlights of Hanna Brothers Studio Café:
- Martin Professional Lighting
- Draper Screens
- JBL Sound
- Soundcraft Digital Mixers
- Crestron Control
- Brightsign Digital Signage
Systems Design and Installation for The Hyatt @ Villa Christina
Atlanta Pro AV provided a fast-track audio solution for The Hyatt Atlanta Perimeter at Villa Christina. The Perimeter area is one of the most popular areas for corporate meetings and social events in Metro Atlanta. Within a couple of months, we were able to design, install, and integrate a first-class audio system throughout the hotel and special events facility. Specific solutions were chosen for the ballrooms, meeting rooms, gym, library, elevators, and common areas.
Our team of technology professionals met all of the time-sensitive operational requirements, architectural concerns, and performance expectations.
Equipment highlights:
- Atlas Sound
- JBL
- Middle Atlantic
- Intellix
- West Penn
- Furman
Warm and Cool LED Lighting for Northwest Presbyterian Church
Northwest Presbyterian Church of Atlanta recently wanted their conventional lights replaced with LED. LED technology has improved greatly over the years, and can now find the perfect color temperature. Finding the balance from warm to cool is easy with the new ADJ ProPar 56 CW WW. With 36 1-Watt LEDs [18 Warm White (3000K) & 18 Cool White LED’s (6000K)], it did the job perfectly. The church had a difficult entrance that wouldn’t allow a scissor lift into the building. Our crew used scaffolding to access the lights and saved the church the expense of a motorized lift.
These LED’s use roughly 60% less energy, and can supply useful light for 50,000 hours of operation or more. The new LED lighting system produces a 70% overall reduction in cost. In addition to lighting, we updated their sound with a Presonus digital console and Shure digital wireless microphones.